Passive fire protection · existing buildings

Survey every door, compartment line and penetration on site.

A field-first survey tool for PFP contractors and fire safety consultants. Capture findings item by item, mark pass, advisory or fail, and produce the remedial schedule before you leave the building.

Service riser with fire-stopped cable and pipe penetrations through a compartment wall

What you can survey

Fire door inspections

Leaf and frame checks, gap measurements, intumescent and smoke seals, hardware, glazing and signage — scored against FD30/FD60 ratings.

Compartmentation surveys

Log breaches in walls, floors and voids with construction type, EI rating, breach size and the remedial action required.

Penetration sealing

Record services, seal systems, aperture sizes and installation condition for every penetration through a compartment line.

Reports and export

Compliance percentages, a remedial schedule of every non-conformance, print-ready reports and CSV export per survey type.